Installation (FAC2100)

Installation 


The following section provides a general guideline on how to install the FAC-2100.


Before installing the controller, inspect it fully for any damage that may have occurred during shipping. Do not install the controller if it appears to be damaged and contact Fairmount Automation for a return materials authorization (RMA) number.


This device must be installed in a manner that ensures no mechanical or electrical limits (as stated in the product specification) are exceeded. Permanent damage to the device may result.


Only qualified personnel should install the FAC-2100 controller. Always remove all power sources before installing the device---failure to do so may result in serious injury and/or equipment damage.


Do not open any covers to the controller while it is located in corrosive or high humidity environments. This may cause damage to the internal circuits.


Cover all unused miniature connector receptacles with receptacle caps.